| Items | Select or fill in |
|---|---|
| Existing system | |
| Is PV already installed? |
|
| Is a battery already installed? |
|
| Have STCs ever been claimed for this battery? |
|
| Zone | |
| State |
|
| Postcode | |
| Product | |
| Product |
|
| Battery |
1
|
| Installation | |
| Mounting position |
|
| Wall material |
|
| Power |
|
| Is backup power required? |
|
| Distance from installation location to meter box |
|
| Grid‑connection application |
|
| STC | |
| To receive the battery STC discount, PV must be installed before or at the same time as the battery. | $0 |
| Indicative amount | |
| For indicative purposes only. Contact us for the actual quotation. | $0 |
| Travel expenses and freight | |